Drilling and Completion Performance Analysis

Drilling and Completion Performance Analysis

Goal of the analysis:

To measure the operational efficiency, cost-effectiveness, and overall quality of drilling and completion activities to optimize well delivery and improve returns.

Data required:

  • Daily drilling reports and completion logs
  • Planned versus actual drilling schedules
  • Total footage drilled and corresponding drilling days
  • Rig rates, service costs, and materials expenditures
  • Non-productive time (NPT) records and root causes
  • Key performance indicators (e.g., rate of penetration, cost per foot)

Detailed step-by-step instruction on how to conduct the analysis:

1. Collect operational drilling data: Gather daily drilling reports, time-depth charts, and completion logs to establish a baseline for performance measurement.

2. Calculate key performance metrics: Derive indicators such as Drilling Efficiency = (Total Footage Drilled / Total Drilling Days) and compare against internal or industry benchmarks.

3. Compare actual to planned performance: Examine discrepancies between planned vs. actual drilling schedules, costs, and well durations to isolate areas of overrun or savings.

4. Analyze non-productive time (NPT): Identify the root causes of delays (e.g., equipment failures, waiting on weather, logistics) and quantify their impact on cost and schedule.

5. Review well completion strategy: Assess the completion design, fluid types, and stimulation methods to determine if they align with the reservoir’s characteristics and well objectives.

6. Perform cost analysis: Break down drilling and completion costs into major components (e.g., rig cost, casing, cement, frac services) to pinpoint high-cost drivers.

7. Identify improvement opportunities: Synthesize findings from performance metrics, cost analysis, and NPT reviews to recommend process optimizations or technology adoption.

Format of the output of analysis:

  • Tabular summaries of drilling KPIs (e.g., rate of penetration, cost per foot)
  • Charts comparing planned vs. actual time and cost performance
  • NPT breakdown with categorized root causes
  • Recommendations for drilling and completion process improvements

How to interpret results:

  • Significant gaps between planned and actual performance may indicate issues in project planning, execution, or technology application.
  • Persistent or high NPT segments highlight areas needing better maintenance, logistics, or operational training.
  • Favorable cost per foot and fast drilling rates suggest efficient processes, potentially enabling expansion of drilling programs or capital reallocation.

Steps a company can take to improve on this measure:

1. Enhance planning and scheduling processes by using detailed offset well data and accurate geological models.

2. Implement performance-based contracts with drilling and service companies to align incentives for reducing costs and NPT.

3. Adopt modern drilling technologies such as top drives, rotary steerable systems, and real-time downhole monitoring.

4. Conduct regular performance reviews and lessons-learned sessions to address issues promptly and share best practices across teams.

5. Invest in predictive maintenance programs for critical equipment to minimize unplanned downtime and enhance overall reliability.