1. What Is Perioperative Surgical Home (PSH)?
The Perioperative Surgical Home (PSH) is a patient-centered, physician-led, multidisciplinary model that coordinates care across the surgical episode—from the decision to undergo a procedure through recovery and transition back to ongoing care. It is a care-delivery and operating-model framework, not a physical facility, payment arrangement, or single clinical protocol.
For health systems and hospitals, the central management question is: who coordinates the entire surgical journey when responsibility otherwise passes between surgical offices, anesthesia, inpatient teams, rehabilitation, and community providers? PSH provides a structure for connecting those teams around one patient-specific plan.
2. Origin and Background
Origin: The American Society of Anesthesiologists (ASA) developed and promoted PSH in the early 2010s. It is an institutional care model rather than a framework attributable to one universally recognized inventor. ASA formalized its vision, strategic principles, and definition in a document dated December 9, 2013.
The model addressed fragmented perioperative care: separate practitioners could produce individually reasonable plans that did not form a coherent surgical episode. Thomas Vetter and colleagues described this problem and the proposed model in 2013. ASA’s national learning collaborative in 2014 subsequently supported implementation across different organizational settings.
PSH drew on the continuity and coordination logic of the patient-centered medical home, but applied it to a time-bounded surgical journey. Its original emphasis on anesthesiology leadership should be understood alongside its essential requirement for collaboration with surgeons and other disciplines.
3. How Perioperative Surgical Home (PSH) Works
PSH replaces disconnected encounters with coordinated episode management. Evidence-based pathways guide routine care, while individual risk, preferences, and recovery needs determine appropriate adaptations. The coordinating team maintains continuity rather than assuming that each departmental handoff will resolve itself.
Understanding the name
- P — Perioperative: The model encompasses care before, during, and after a procedure.
- S — Surgical: The surgical episode, rather than an isolated consultation or hospital admission, is the organizing unit.
- H — Home: “Home” describes continuity and coordination—not a building or a requirement to recover at home.
The core principles
ASA identifies six principles: patient-centered, including shared decision-making and engagement; physician-led; team-based; evidence-based; coordinated; and safe. These are design requirements, not six sequential implementation steps.
Interpreting the surgical continuum
A practical implementation can organize responsibilities across four phases. Published PSH implementation work has explicitly addressed preoperative, intraoperative, postoperative, and postdischarge management.
| Phase | Management questions to resolve |
|---|---|
| Before surgery | Who coordinates assessment, patient preparation, outstanding decisions, and anticipated discharge needs? |
| During surgery | How do teams access the agreed plan, communicate changes, and manage handoffs? |
| Postoperative care | Who monitors recovery milestones, coordinates rehabilitation, and escalates concerns? |
| After discharge | Who confirms follow-up, communicates medication changes, and transfers responsibility to ongoing providers? |
Do not stop the pathway at the hospital door. When patients need post-acute and home health services, specify referral acceptance, information transfer, and escalation ownership. A referral sent is not necessarily a transition completed.
The useful management artifact is therefore an episode pathway with named responsibilities, clinical decision points, handoffs, and measures—not merely a collection of order sets. Clinical leaders must approve its clinical content and preserve individualized judgment.
4. When to Use Perioperative Surgical Home (PSH)
Consider PSH when the improvement opportunity crosses organizational boundaries: repeated late preoperative workups, inconsistent preparation, conflicting instructions, unreliable discharge arrangements, or unclear ownership after discharge. It is especially useful when a surgical service line needs continuity rather than another isolated departmental initiative.
Useful executive questions include:
- Which surgical cohorts need different levels of preparation and coordination?
- Where do handoffs create avoidable delay or uncertainty?
- What staffing and information infrastructure would support episode ownership?
- Are apparent hospital savings offset by additional postdischarge resource use?
Start with patient-level episode data, cancellation reasons, pathway adherence, outcomes, resource use, and patient feedback. Bring together surgery, anesthesia, nursing, rehabilitation, pharmacy, case management, finance, and information technology. Published implementations illustrate the importance of multidisciplinary pathway development.
PSH is not a good fit as the sole answer to a narrowly technical surgical problem. Urgent pathways also require different preparation assumptions from elective pathways. As a practical implication of the model, expect misleading conclusions if teams cannot distinguish differences in patient risk from differences in delivery performance. Discovery and design are only the beginning; allow additional time for clinical approval, workflow changes, training, and evaluation.
5. How to Apply Perioperative Surgical Home (PSH): Step-by-Step
- Clarify the decision and scope.
Define the problem, sponsor, surgical specialty, facilities, and implementation horizon. Specify where episode responsibility begins and ends, including arrangements for patients whose recovery extends beyond the measurement window.
- Gather the required inputs.
Combine clinical records, scheduling data, cancellation reasons, discharge information, patient feedback, and cost data. Interview frontline teams and patients to understand failures that administrative datasets do not reveal.
- Define the units of analysis.
Use surgical episodes grouped by procedure and clinically meaningful risk characteristics. Separate elective from urgent cases and distinguish inpatient from ambulatory pathways where their operating requirements differ.
- Construct the episode pathway.
Map the current journey, then design the proposed pathway. For every transition, document the accountable role, required information, completion criteria, and escalation route. Incorporate existing clinical pathways rather than duplicating them.
- Analyze gaps and competing explanations.
Identify where responsibility, capacity, or information breaks down. Check whether apparent variation reflects legitimate clinical differences. Compare cohorts with consistent definitions and examine missing postdischarge data before drawing conclusions.
- Translate findings into an operating model.
Specify coordination staffing, physician leadership, coverage, electronic workflows, and approved protocols. Where responsibilities remain fragmented, service delivery design should connect the proposed pathway to funded roles and workable daily routines.
- Test sensitivities and safeguards.
Challenge assumptions about surgical volume, navigator workload, rehabilitation availability, and follow-up completion. Separate released capacity from cash savings. Pair efficiency measures with complications, unplanned utilization, patient experience, and access measures.
- Align stakeholders, pilot, and iterate.
Agree on clinical authority, budget ownership, patient communication, and escalation arrangements. Pilot with a defined cohort, review results jointly, and revise the pathway before scaling. Include patient representatives when assessing whether the redesigned journey is understandable and feasible.
6. Example: Perioperative Surgical Home (PSH) in Action
Fictional example: Harbor Valley Health operates two hospitals with separate orthopedic scheduling teams. Its elective hip and knee replacement patients receive inconsistent preparation instructions, and rehabilitation arrangements are sometimes unresolved near discharge.
The chief operating officer and physician leaders select PSH because the problem spans the episode. Their units of analysis are individual primary joint-replacement episodes, segmented by procedure, medical complexity, and recovery-support needs.
The team reviews records, cancellation reasons, discharge delays, and patient interviews. It finds that several problems begin before admission: outstanding assessments lack an owner, and home-support requirements are identified too late.
Harbor Valley establishes surgeon–anesthesiologist co-leadership, assigns a navigator, and creates a shared episode plan. Clinicians define preparation pathways and exceptions; case managers begin discharge planning earlier; rehabilitation partners confirm referrals; and patients receive a clear contact route after discharge.
In this illustrative scenario, the pilot improves preparation completion and referral reliability. Leaders assess complications, unplanned returns, patient experience, and staffing cost before expanding. They do not equate better coordination with proven financial savings.
Scaling requires program management support to coordinate training, electronic-record changes, partner readiness, milestones, and unresolved decisions across both hospitals.
7. Strengths and Limitations
Strengths
- Episode-wide visibility: PSH connects preparation, procedural care, recovery, and transitions instead of optimizing each separately.
- Shared clinical and operational ownership: It gives multidisciplinary teams a common structure for coordinating care.
- Consistency with adaptation: Evidence-based pathways can reduce unexplained variation while retaining patient-specific decisions.
Limitations
PSH does not prescribe one universal staffing model or automatically align budgets and professional incentives. Local implementation must resolve these issues. Early reports support feasibility, but observational findings should not be treated as a guaranteed causal effect in another institution.
Measurement boundaries are particularly important. One published financial analysis excluded postdischarge costs, while a readmission case report could not capture admissions outside its health system. Both limitations illustrate why hospital-only reporting can overstate episode performance.
For population-health leaders, evaluate access alongside outcomes. A pathway that appears successful because it disproportionately enrolls well-supported, lower-risk patients should not be accepted as evidence of better care for the whole eligible population.
8. Common Pitfalls and How to Avoid Them
- Rebranding a preoperative clinic: Improving assessment alone leaves recovery and transitions disconnected. Define responsibility across the complete episode.
- Confusing coordination with clinical control: A coordinating team needs clear authority, not undefined responsibility for every decision. Agree on decision rights and escalation routes.
- Standardizing away legitimate differences: A single pathway can obscure patient needs. Require documented clinical exceptions and appropriate alternative tracks.
- Rewarding shorter stays alone: Efficiency may conceal additional burden after discharge. Track recovery, unplanned utilization, and patient experience alongside hospital measures.
- Ignoring patients who cannot follow the pathway: Transport, language, or caregiver barriers should trigger support, not automatic exclusion. Review participation and outcomes across relevant groups.
- Approving an unfunded design: Unassigned navigator work and unavailable follow-up capacity undermine execution. Confirm staffing, coverage, and partner commitments before launch.
These safeguards are practical implementation recommendations: use PSH to expose coordination problems, not to declare them solved merely because a pathway has been documented.
9. How Perioperative Surgical Home (PSH) Relates to Other Frameworks
Enhanced Recovery After Surgery
Enhanced Recovery After Surgery (ERAS) emphasizes evidence-based perioperative recovery pathways. PSH emphasizes the organizational coordination surrounding the episode. They overlap, but an ERAS protocol is not, by itself, a complete PSH operating model. Specialty-specific ERAS guidance can supply clinical content within the broader coordination structure.
Model for Improvement
The Model for Improvement helps teams define their aim, determine whether a change is an improvement, and select changes to test. Its Plan–Do–Study–Act (PDSA) cycles support small-scale testing and adaptation. Use PSH to organize the proposed delivery model, then use improvement cycles to test whether particular workflow changes work locally.
If the problem is confined to one established recovery protocol, targeted ERAS implementation may be sufficient. If ownership breaks down between services or settings, PSH offers the more relevant organizing lens.
10. Key Takeaways
- PSH organizes the surgical episode, not just the operating room.
- Its central management task is continuity with explicit accountability.
- Build procedure- and risk-appropriate pathways rather than one universal template.
- Fund the roles and workflows needed to make coordination real.
- Judge improvement using safety, recovery, experience, access, and episode economics—not length of stay alone.
11. FAQs About Perioperative Surgical Home (PSH)
Is PSH the same as ERAS?
No. ERAS supplies recovery-focused clinical pathways; PSH provides broader episode coordination and organizational responsibility. They can be implemented together.
Must an anesthesiologist lead the PSH?
ASA’s principles specify physician leadership, and anesthesiologists have played a central role in developing the model. Governance should nevertheless be collaborative, with explicit responsibilities for surgeons and other participating disciplines.
Does PSH always end 30 days after discharge?
No. Some published formulations use a 30-day postdischarge horizon, while ASA’s definition emphasizes recovery and return to ongoing care. Distinguish the reporting window from the arrangements needed for clinical continuity.
Can a smaller hospital implement PSH?
A sensible starting approach is one surgical cohort, existing multidisciplinary leadership, a clear coordinating role, and a small set of reliable measures. Match the design to available resources, but do not omit postdischarge ownership simply to make implementation easier.
