Goal of the analysis:
To evaluate the technical and economic viability of applying EOR methods (e.g., waterflood, gas injection, chemical, thermal) to improve hydrocarbon recovery beyond primary and secondary recovery stages.
Data required:
- Reservoir characterization data (porosity, permeability, fluid composition)
- Well production and decline history
- Pressure, temperature, and rock-fluid interaction parameters
- Water and gas availability, chemical costs, or steam generation capability (depending on EOR method)
- Pilot test results (if available)
- Economic assumptions (oil price, CAPEX, OPEX, discount rate)
Detailed step-by-step instruction on how to conduct the analysis:
1. Review reservoir characteristics for EOR suitability: Examine rock and fluid properties to identify which EOR techniques are potentially applicable (e.g., gas injection in light oil reservoirs, thermal methods for heavy oil).
2. Gather historical production and decline data: Identify the recovery gaps between current recovery levels and theoretical or analogous field potentials, establishing a baseline for EOR improvement.
3. Screen EOR methods: Compare various methods (waterflood, miscible gas, polymer flooding, steam injection, etc.) against reservoir characteristics, resource availability, and cost parameters to shortlist the most viable options.
4. Conduct laboratory or pilot studies: If possible, run lab-scale tests or field pilots to validate the effectiveness of the selected EOR technique and gather performance data.
5. Build simulation models: Use reservoir simulators to model EOR scenarios, estimating additional recovery, breakthrough times, and associated incremental production.
6. Perform economic evaluation: Calculate incremental reserves, capital requirements, operating costs, and net present value (NPV) or internal rate of return (IRR) for each EOR scenario.
7. Develop an implementation roadmap: Outline the required infrastructure upgrades, operating procedures, and monitoring plans for the selected EOR program, taking into account potential risks and uncertainties.
Format of the output of analysis:
- EOR feasibility report summarizing potential methods, incremental recovery estimates, and economic metrics
- Reservoir simulation results showcasing production profiles and recovery forecasts under different EOR techniques
- Risk assessment covering technical, operational, and market uncertainties
- Implementation plan with recommended EOR method, pilot design, and a schedule for full-scale deployment
How to interpret results:
- Higher incremental recovery and favorable economics (e.g., acceptable NPV, IRR) signal that an EOR technique is viable for expanding field reserves.
- A mismatch between predicted and actual pilot outcomes may indicate data gaps or the need to refine simulation models and operational parameters.
- Risk assessment outcomes help prioritize which EOR methods to pursue or eliminate due to technical or economic infeasibility.
Steps a company can take to improve on this measure:
1. Invest in advanced reservoir characterization and lab testing to accurately screen and match EOR techniques with reservoir conditions.
2. Leverage pilot programs to validate assumptions and derisk large-scale EOR projects before committing significant capital.
3. Adopt cutting-edge simulation tools with robust compositional or thermal modeling capabilities to refine EOR designs.
4. Collaborate with technology providers for specialized EOR solutions and knowledge transfer, reducing implementation risks.
5. Monitor and adjust EOR operations in real time (e.g., injection rates, chemical concentrations) based on ongoing performance data to optimize incremental recovery.
Request the PDF Download of How to Analyze an Upstream Oil Company
Menu of the analyses:
A. Exploration & Resource Assessment
- Reserves and Resource Base Analysis
- Reserve Replacement and Exploration Success Analysis
- Exploration Portfolio Quality and Frontier/Deepwater Risk Assessment
- Basin/Play Competitiveness Analysis
- Reservoir Characterization and Recovery Factor Benchmarking
- Seismic Data and Geological Modeling Effectiveness Review
- Unconventional Play Assessment and Development Planning
B. Drilling & Well Construction
- Drilling and Completion Performance Analysis
- Multilateral and Horizontal Well Drilling Feasibility Review
- Well Spacing, Infill Drilling Optimization, and Drilling Inventory Prioritization
- Sand Control and Completions Strategy
- Managed Pressure Drilling and Underbalanced Drilling Feasibility
- High-Pressure/High-Temperature (HP/HT) Well Design and Integrity Assessment
- Rock Mechanics and Geomechanical Modeling to Mitigate Drilling Risks
- Drilling Fluids Engineering and Optimization Analysis
- Blowout Preventer (BOP) Reliability and Well Control Risk Assessment
- Wellbore Stability Analysis and Lost Circulation Mitigation
C. Production & Field Development
- Production Profile and Decline Curve Analysis
- Lifting Cost and Operational Efficiency Analysis
- Enhanced Oil Recovery (EOR) Potential and Technology Assessment
- Capital Project Planning and Field Development Scheduling
- Field Life Extension and Brownfield Redevelopment Strategy
- Workover and Well Intervention Planning
- Gas Handling and Flaring Minimization Analysis
- Advanced Reservoir Management and Production Optimization Techniques
- Flow Assurance and Production Chemistry Management
- Subsea Tieback Feasibility and Infrastructure Optimization
- Waterflood and Reservoir Pressure Maintenance Strategy Evaluation
- Artificial Lift System Selection and Optimization
- Produced Water Management, Treatment, and Disposal Strategy
- Floating Production, Storage, and Offloading (FPSO) Economic and Operational Review
D. Commercial & Strategic Evaluations
E. Specialized & Cross-Cutting Technologies