Add Dropdowns, Checkboxes, and Status Fields with Gemini

Add Dropdowns, Checkboxes, and Status Fields with Gemini

What You Will Learn

You will learn how to use Gemini to add structured controls such as dropdowns, checkboxes, priority fields, risk levels, approval fields, owners, and status values to make a tracker easier to manage.

Required Dataset

Use the tracker from Lesson 10.

You will use:

Cost_Reduction_Tracker
Cost_Reduction_Check

Before You Start

Open Cost_Reduction_Tracker. Make sure it includes fields such as initiative name, cost category, estimated savings, effort level, owner, status, next step, due date, risk, and notes.

Step-by-Step Instructions

Step 1. Ask Gemini to recommend control fields

Open Gemini and enter:

Act as a project management spreadsheet coach.

Review the Cost_Reduction_Tracker tab and recommend which fields should use dropdowns, checkboxes, or status fields.

Focus on priority, status, owner, risk level, approval, review needed, and completion tracking.

Step 2. Add dropdown fields

Ask Gemini:

Add or recommend dropdown values for these fields:

– Priority
– Status
– Effort Level
– Risk Level
– Approval Status
– Review Needed

Use values such as:

Priority: High, Medium, Low
Status: Idea, Sizing, Approved, In Progress, Blocked, Implemented, Rejected
Effort Level: Low, Medium, High
Risk Level: Low, Medium, High
Approval Status: Not Submitted, Pending, Approved, Rejected
Review Needed: Yes, No

If Gemini cannot apply the dropdowns directly, add them manually using:

Insert > Dropdown

Step 3. Add checkboxes

Add checkbox columns such as:

Savings Validated
Owner Confirmed
Approved for Implementation
Completed

Use:

Insert > Checkbox

Checkboxes are useful for simple yes/no review steps.

Step 4. Add a review-needed formula

Create a Review Needed column and use a formula like:

=IF(OR([Owner]=””,[Next Step]=””,[Risk Level]=”High”,[Approval Status]=”Pending”),”Yes”,”No”)

Replace bracketed field names with actual cell references.

Expected Result

Your tracker should now have dropdowns, checkboxes, status fields, and review flags that make it easier to filter, prioritize, and manage initiatives.

Check Your Work

Confirm that dropdown values are consistent, checkboxes are used only for true yes/no fields, status values are clear, and the Review Needed formula flags incomplete or risky rows.

Optional Extension

Ask Gemini:

Review the Cost_Reduction_Tracker tab and suggest conditional formatting rules for high-priority, blocked, overdue, or review-needed initiatives.

How to get started

1

arrow-down-blue

Tell us about your project

2

arrow-down-blue

Interview candidates

(We’ll provide bios within 48 hours on average)

3

Select your consultant and start work

Find a Consultant

or email us at: [email protected]