Two or more parallel timelines (e.g., Base vs Accelerated) on the same slide for side-by-side contrast.
1 Slide Type Name
Scenario‑Comparison Timeline
2 One‑Sentence Purpose Statement
Lets decision‑makers instantly see “how schedule and milestones shift under different scenarios (e.g., Base vs. Accelerated vs. Delayed).”
3 Visual Description (Designer Instructions)
- Start with a 16 × 9 slide and draw a single horizontal time axis across the top 40 % of the canvas.
- Below the axis, stack two (or more) identical horizontal lanes—one per scenario. Label each lane at the far left (Base Case, Accelerated, Constrained, etc.) in 11 pt bold.
- In each lane, place milestone markers or phase bars at the dates dictated by that scenario. Align them vertically so corresponding milestones form easy‑to‑compare columns.
- Colour‑code each scenario’s markers/bars with a distinct but coordinated palette (e.g., blue = Base, green = Accelerated, orange = Delayed). Keep milestone shapes consistent across scenarios.
- Connect corresponding milestones across lanes with faint dotted vertical guide lines to emphasise deltas without clutter.
- Annotate schedule deltas (e.g., “‑4 wks” or “+2 mo”) beside or beneath shifted milestones—use small call‑out boxes or inline text, colour‑matched to the affected scenario.
- Add a vertical “Today” line through all lanes for context. Optionally shade the time window between “Today” and a milestone in each scenario to visualise the gap.
- Reserve the top 15 % for a concise headline and legend explaining colour coding. Maintain generous white space so labels never collide with the axis or guide lines.
- Use sans‑serif fonts: milestone labels 9 pt; axis tick labels 10 pt; scenario headings 11 pt bold.
4 Business Questions This Slide Answers
- How much sooner (or later) do milestones land under each scenario?
- Which scenario meets a fixed deadline or regulatory date?
- Where do resource or cost trade‑offs materially change the timeline?
- What is the lead time we still have under the slowest path?
- Which milestones are immovable across all scenarios?
5 When to Use (Typical Situations)
- Executive decision meetings weighing “fast‑track” vs. “normal” schedules.
- Contingency planning for supply‑chain or regulatory delays.
- Sales or marketing roadmap options tied to product‑launch timing.
- Negotiations with vendors on expedited delivery.
- Board updates requiring transparency on aggressive vs. realistic timelines.
6 Core Data Fields Required
- Scenario names.
- Milestone titles and dates for each scenario.
- Common time axis (start and end dates).
- Current date (“Today”) marker.
7 Optional / Advanced Data Fields
- Numeric schedule deltas (weeks/mo) auto‑calculated and displayed.
- Cost or resource delta per scenario shown as inline badges.
- Probability or confidence score for each scenario.
- Owner or accountable leader for each scenario
- Conditional formatting (e.g., highlight milestones that slip past a contractual deadline).