Arrows or connectors explicitly map dependencies between milestones across tracks.
1 Slide Type Name
Dependency (Predecessor‑Successor) Timeline
2 One‑Sentence Purpose Statement
Makes it crystal‑clear “which milestone must finish before another can start, and when each link occurs.”
3 Visual Description (Designer Instructions)
- Prepare a 16 × 9 slide with multiple horizontal swim‑lanes (work‑streams or functional tracks) stacked top‑to‑bottom; share one common time axis across the top.
- In each lane, place milestone markers or slim duration bars in chronological order. Space them precisely according to dates.
- Draw explicit dependency connectors: thin arrows that originate at the trailing edge of a predecessor bar/marker and point to the leading edge of its successor (often in another lane). Use right‑angled connectors (horizontal then vertical) to keep arrows readable and to minimise overlap.
- Colour‑code arrows by dependency type (e.g., critical path in red, secondary in grey) and make arrowheads clear but unobtrusive (≈ 1.5 pt stroke).
- Optionally highlight the critical path milestones themselves with a bold outline or accent colour.
- Add a vertical “Today” line spanning all lanes to give immediate context for which dependencies are imminent.
- Keep labels concise: milestone title inside or above its marker; dependency type (FS, SS) shown only in the legend to avoid clutter.
- Reserve the top 15 % for slide headline and a compact legend explaining arrow colours and dependency abbreviations. Maintain generous white margins around the grid.
4 Business Questions This Slide Answers
- Which tasks are on the critical dependency chain?
- What must finish (or start) before the next milestone can begin?
- Where are cross‑team hand‑offs that could cause delay?
- How much slack exists before a downstream task is impacted?
- Are upcoming dependencies still on track as of today?
5 When to Use (Typical Situations)
- Integrated program plans with many inter‑team hand‑offs.
- Steering‑committee reviews that need focus on critical‑path risk.
- Vendor‑client implementation timelines where deliverables are interlocked.
- Regulatory projects requiring evidence of dependency coverage.
- Agile release trains mapping upstream API readiness to downstream feature work.
6 Core Data Fields Required
- Work‑stream lane names.
- Milestone/task titles with start/finish dates.
- Dependency pairs (predecessor ID, successor ID, dependency type).
- Current date (“Today”) marker.
7 Optional / Advanced Data Fields
- Dependency type code (FS, SS, FF, SF) indicated by arrow style.
- Risk status or buffer days displayed near critical connectors.
- Owner initials on milestones for quick accountability.
- Percent complete shading on bars.
- Automatic critical‑path highlight based on float calculation.