Branching paths show alternate sequences after key decision nodes, ideal for scenario planning.
1 Slide Type Name
Decision‑Tree Timeline
2 One‑Sentence Purpose Statement
Clarifies “what sequence of events unfolds under each possible decision or scenario, and by when.”
3 Visual Description (Designer Instructions)
- Set up a 16 × 9 slide with time running left‑to‑right along the top third; draw a thin horizontal axis with evenly spaced date ticks (weeks or quarters, depending on horizon).
- Place the initial milestone (Decision 0) on the axis. From this node, draw two or more diverging branches downward at a 30–40° angle—each branch represents a decision outcome (e.g., Regulator Approves, Regulator Rejects).
- On each branch, convert back to horizontal flow: plot subsequent milestones / tasks as small rectangles or diamonds, laid out in a true time sequence beneath the main axis. Label each with title + date in 9 pt text.
- When further forks occur, repeat: a new decision diamond, then branches showing alternate timelines. Keep branch angles consistent so the tree reads cleanly; use curved connectors or angled straight lines (1.2 pt).
- Colour‑code each branch path (maximum 3‑4 hues) to distinguish scenarios; match milestone boxes to branch colour but keep axis neutral grey.
- Add a vertical “Today” line intersecting the entire tree if status matters. Optionally annotate each path with probability (%) or NPV in a small badge near the branch stem.
- Reserve the top 15 % for the slide title and a legend mapping colours to scenario names; ensure no branch intrudes into this safe zone.
- Fonts: sans‑serif; branch labels 10 pt bold near the split; milestone text 9 pt; headline 16 pt bold.
4 Business Questions This Slide Answers
- What happens next if Decision A goes one way or the other?
- How long is the critical path for each scenario?
- Which contingent activities can start only after a specific decision point?
- What is the latest we can make a decision without sliding the schedule?
- How do cost, probability, or benefit differ across alternative timelines?
5 When to Use (Typical Situations)
- Regulatory approval planning with go/no‑go implications.
- Scenario‑based supply‑chain contingency timelines (e.g., port strike vs no strike).
- Capital‑project gating where design choice drives downstream tasks.
- Strategic option evaluation (acquire vs partner vs build).
- Crisis‑management playbooks outlining alternate response paths.
6 Core Data Fields Required
- Decision nodes (titles, dates).
- Branch labels (scenario name or outcome).
- Milestone titles and dates for each path.
- Current date (“Today”) if highlighting live status.
7 Optional / Advanced Data Fields
- Probability or confidence for each branch.
- Financial impact or cost per scenario.
- Owner or accountable team per branch.
- RAG status on milestones within each path.
- Cumulative duration or critical‑path indicator shown alongside each branch.