Download the files for the course

Enter your information to receive the files you need to complete this resource in your inbox.

Independent Model Audit

Your starting point

Open your completed CP17 workbook. Compare with the matching cumulative reference only after attempting the exercise.

Your objective

  • Build an independent direct cash operating bridge from receipts, purchases, accruals, taxes and interest.
  • Distinguish formula errors from economic funding warnings.
Source evidence / new releaseWhere to find it
Student source workbookD01–D06 history and the finished integrated model
Forecast years / unit2026–2030 in H:L; USD thousands unless row says units, days, ratios, $/unit or headcount
Current control stageBase selected (scenario 1). Preserve 2022–2025 history and opening balances.

Why this step matters

An independent direct CFO bridge should equal indirect CFO. Accounting residuals should be near zero and separate from warnings about covenant headroom or cash-floor shortages.

Build instructions

  • 1. Build only the cells and schedules authorized for Step 18. Work in the named worksheet and start from the prior cumulative checkpoint.
  • 2. Use the source-data identifiers and the central Assumptions sheet; derived outputs are formulas rather than typed constants.
  • 3. Enter the seed formulas in the next table. For year-based rows, H corresponds to 2026 and the same formula pattern extends right through L (2030); explicitly except noted loan support in M/N.
  • 4. Use the verification values only after the calculation. Review the business interpretation and troubleshoot issues before accepting the comparison workbook.
  • 5. Diagnose incorrect signs/assumptions using disposable input changes. Remove faults and restore Base before continuing.

Cell-by-cell examples from the corresponding workbook

For rows in H, continue the formula pattern through L unless the source year or fixed absolute address requires a different copying direction. Historical E:G rows cover 2023–2025. Do not put forecast formulas into an unbuilt stage.

DestinationExact formula or fixed input (selected examples)
Cash_Flow!H25=Working_Capital!H10-Working_Capital!H14
Cash_Flow!H26=Working_Capital!H18-Working_Capital!H21
Cash_Flow!H27=People_Opex!H19-Working_Capital!H27+People_Opex!H26+Working_Capital!H24+Tax_Equity!H11+Debt!H27
Cash_Flow!H28=H25-H26-H27
Cash_Flow!H29=H28-H12
Checks!H10=Balance_Sheet!H34
Checks!H11=Cash_Flow!H24
Checks!H12=Cash_Flow!H29
Checks!H13=Fixed_Assets!H88
Checks!H14=Debt!H28
Checks!H20=IF(MAX(ABS(H10),ABS(H11),ABS(H12),ABS(H13),ABS(H15))<0.00001,"ACCOUNTING PASS","ACCOUNTING ERROR")
Checks!H21=IF(H14>0,"UNFUNDED / CASH FLOOR BREACH","FINANCED AT YEAR-END")

Verify after the exercise

Verification itemReference after the exercise
2026 independent direct CFO1,528.17618
2026 direct-minus-indirect CFO0.00000
2026 BS difference0.00000
Accounting controlBalance-sheet and direct/indirect CFO residuals near zero (floating tolerance).

Common mistakes and repairs

  • A direct cash bridge differs from indirect: check purchases instead of COGS and prepayment/accrual signs.
  • A shortage flag is not the same as a balance sheet residual.

Interpretation questions

  • 1. How can direct CFO expose the wrong sign on a working-capital change?
  • 2. What is an economic warning that does not by itself cause accounting error?

Before moving to the next checkpoint

Confirm the intended cells for this stage, retain their formulas, restore Base assumptions and save a distinct working copy. Use the matching cumulative reference to review your work only afterward. A mathematically equivalent transparent formula is acceptable when signs, timing, controls and input response agree.

Next: Chapter 19 - Management Dashboard

How to get started

1
arrow-down-blue

Tell us about your project

2
arrow-down-blue

Interview candidates

(We’ll provide bios within 48 hours on average)

3

Select your consultant and start work

Find a Consultant in Our Retail Practice

or email us at: [email protected]